|
|
|
Orang
stabilized with inhalation anesthesia and prepared for
intra-oral x-rays
|
|
View
of the oral cavity showing typical staining of the dentition
|
|
|
|
View
of the healed maxillary right second pre-molar following
utilization of our standard extraction site management Protocol
presented in the Education
Section
|
|
View
of Mandibular right first and second molar extraction site as
seen in the reflecting mirror
|
|
|
|
View
of the upper dentition showing that both 2ed Pre-molars are
missing. Notice the apparently healthy periodontium of the 4
incisors
|
|
Notice
in the mirror the 15 mm periodontal pocket located between the
maxillary left central and lateral incisors.
|
|
|
|
Patient
with endotracheal tube securely fastened to a modified syringe
casing, which functions as an atraumatic mouth prop.
|
|
An
intra-oral view of the maxillary anterior dentition.
Notice the secure positioning of the mouth prop to provide
maximum visual access to the patient's upper left lateral
incisor.
|
|
|
|
A
view into the inter-proximal space between the central and
lateral incisors revealing the 15mm periodontal defect.
|
|
A
radiographic view of the periodontal defect during debridement
of defect, and before placement of bone graft repair material.
|
|
|
|
Cleaning
of bony defect with hydrogen peroxide and sodium hypochlorite
flushing solutions.
|
|
Placement
of Bioglass synthetic particulate bone grafting materials into
periodontal defect.
|
|
|
|
Post
operative radiographic view of repaired bony periodontal defect.
|
|
Post
operative intra-oral view of sutured gingival flap with
resorbable knots hidden below the gingival tissues on the
palatal aspect of the teeth away from the patient's curious
fingernails.
|